MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building

"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added., This news data comes from:http://705-888.com
- South Korean President vows support to Koreans arrested in US immigration raid
- President Marcos commits to boosting PH digital infrastructure
- Social media erupts: Politicians' children face backlash for flaunting wealth
- House resumes budget briefings
- Leviste files charges against DPWH engineer who tried to bribe him
- 'Pink and green' protests call for a reset in Indonesia
- Wildfire tears through California gold rush town
- Lookout bulletins out vs Atong Ang, Barretto
- Marcos wants subpoena power for body investigating flood projects
- Putin tells Xi China-Russia ties are at 'unprecedented level'